Sunday, February 27, 2011

As of Feb 27.......

Heres the latest. We have the floors completely framed, the loft finish floor/kitchen finished ceiling is done. We'll be spending next week working on the loft balcony/hallway, and getting started on insulating the ceiling, along with the finished pine ceiling (both at the same time) This will be tedious, but it will be great to have it all done. No electrical buried in the ceiling, so we have the go ahead to insulate and cover the ceiling. Thats about all for now, here are the pics.



looking up from the basement

standing in kitchen looking towards dining area (south windows)

the loft, there will be a wall there eventually


Tough to get a picture of the whole loft, and it looks small, but its actually a very good size area

looking up a the loft floor/kitchen and dining ceiling

Main floor bathroom,

custom hanger to support the loft hallway beam

the balcony/hallway. you will step out onto this when you exit the staircase at the loft

looking at the balcony from inside the bathroom